Little River Resort Homeowners Association

Pool and Hot Tub

September, 2010 Annual Meeting
January, 2010 BOD Minutes
October-2010 Board Meeting Minutes
Beach Report
LRR Emergency Contact Information
About Us
Current Events
Layout of Complex
2011 Meeting Schedule
Boat & Motorcycle Storage
Recognizing A Stroke
Investment Properties for sale
Rates for 2011
2009 Budget
Minutes of September 19, 2009 Annual HOA Meeting
Vehicle Identification
Hot Water Heaters
Guestbook
Weather & Local News
Landscape Photos
Maintenance Calender
Pool and Hot Tub
Golf Courses
Tennis Courts
Screened In Porch Procedure
Security
Neighborhood Watch Committee
Filter Changing
Your Property Management Team
Cable & Satellite Dishes
Rules and Regulations
Letters to the Editor
Master Deed
Articles of Incorporation
By-Laws
Amendments

Sequence of Jacuzzi under construction
dsc01287.jpg
September 20, 2009

The new Jacuzzi at long last is under construction.  This photo shows the form of the Jacuzzi with the plumbing in place.  Arnold pools is the pool contractor. 

Shows pool & New Jacuzzi location
lrrpool.jpg
September 20, 2009

The pool is in the foreground with the construction of the Jacuzzi in the back.  This picture was taken standing at the approximate location of the previous Spa.  The bathrooms are to the right of the new Jacuzzi.

dsc01291.jpg
September 21, 2009

This picture shows the re-bar in place and ready for the concrete to be sprayed on the walls.

Forms in place for the seating on top of Jacuzzi.
hottub3.jpg
October 7, 2009

Seat around top has been poured & finished.
dsc01315.jpg
October 22, 2009

dsc01323.jpg
October 23, 2009

The concrete has to be "pumped" from this truck through hoses to the Jacuzzi construction site about 120 yards away.  The crew pictured here is getting ready to pump the concrete to the waiting crew, where they will spray the concrete onto the forms shown in other pictures. 

dsc01321.jpg
October 23, 2009

The crew for Arnold's Pools, our contractor, is shown here providing the finishing touches to the interior of the Jacuzzi.  These worker's worked tirelessly throughout the day and late into the evening to make sure the concrete was finished correctly.

Water added to cure the concrete
dsc01324.jpg
October 23, 2009

The enterior of the pool is basically done.  Water was added to "cure" the concrete. The contractor is waiting on the electrical contractor to hook up all the electrical apparatus, such as pumps, blowers, etc.  The exterior of the pool will still be treated and some landscaping will need to be done, but as you can see by the picture above and the one below, having an operating Jacuzzi is getting closer and closer.  There is still much to be done, but maybe one day soon, we can have a ribbon cutting to open it officially.

View from above
dsc01325.jpg
October 23, 2009

hottub6.jpg

This photo, provided by one of our owners, Dennis Fenstamaker, was taken December 4, 2009 and is being enjoyed by his wife and child.  After all these years we finally have a new Jacuzzi!